1 thought on “Due to the rectification of UPS power, how to notify the power supply of the WeChat group in the unit of the unit”
Devin
Due to the rectification of UPS power supply, the unit power supply is now closed in the WeChat group. This water and electricity installation materials are divided into main materials and auxiliary materials. The supply methods include A supply, A fixed supply, and B supply; the supply materials are generally: electric wires, cables, PVC electrical tubes and accessories, bridges, power distribution boxes, power distribution boxes , Pipe pipes and pipes, drainage pipes and pipes, submersible pumps, valves, etc.; A fixed -fixed supply material is generally: switch, socket, lamp, steel -plastic pipe, galvanized steel pipe and pipe parts, welding steel pipes and pipe parts; For auxiliary materials. The supervision unit organizes the promptly organized supervision engineer to perform the pre -acceptance and acceptance to achieve the quality standards stipulated in the design and contract. The supervision unit shall submit the quality assessment report to the construction unit in a timely manner. (Timely rectification of problems should be rectified in time, and we must have the ability to grab work.
Due to the rectification of UPS power supply, the unit power supply is now closed in the WeChat group.
This water and electricity installation materials are divided into main materials and auxiliary materials. The supply methods include A supply, A fixed supply, and B supply; the supply materials are generally: electric wires, cables, PVC electrical tubes and accessories, bridges, power distribution boxes, power distribution boxes , Pipe pipes and pipes, drainage pipes and pipes, submersible pumps, valves, etc.; A fixed -fixed supply material is generally: switch, socket, lamp, steel -plastic pipe, galvanized steel pipe and pipe parts, welding steel pipes and pipe parts; For auxiliary materials.
The supervision unit organizes the promptly organized supervision engineer to perform the pre -acceptance and acceptance to achieve the quality standards stipulated in the design and contract. The supervision unit shall submit the quality assessment report to the construction unit in a timely manner. (Timely rectification of problems should be rectified in time, and we must have the ability to grab work.